T9 Tramway richez-associes-t9-paris-orly-32_r

Paris - Orly

T9 Tramway

From Porte de Choisy to the new Orly city centre, the former RN305 continues its redevelopment as a calm urban avenue, vector of transit and urban regeneration.

T9 Tramway r6a0198_r
T9 Tramway tpo_trace

Project to unite an entire region, the tramway defines the new unified urban space of Boulevard des Arts and designs future transit spaces, from T3 to RER C via the Grand Paris Express train station.

Adapting to the site characteristics, development stages the urban planning of the vast 20th century estates such as the Château de Choisy-le-Roi and anticipates future urban development within this changing sector.

T9 Tramway baptistejayat053_r
T9 Tramway r6a9161_r
T9 Tramway r6a9809
60,000 passengers per day
T9 Tramway r6a9834-29
Car park spaces removed to give cyclists greater visibility
T9 Tramway r6a9975
 The line is characterised by a central platform made up mainly of plants
T9 Tramway richez-associes-t9-paris-orly-cecile-septet_page-6

Status

2013: preliminary studies - 2018: work began - March 2021: opened for service

Location

Paris (75) / Ivry-sur-Seine - Vitry-sur-Seine - Thiais - Choisy-le-Roi - Orly (94)

Client

Transamo, for Île-de-France Mobilités

Commission

Project management for a 10.3 km tram line and 19 stations: integration, transport system, associated developments, landscaping and coordination with the other project managers (maintenance depot and system)

Cost

404 M€

Design team

Ingérop (lead) + Setec + Richez_Associés + Concepto + Bérim + Planitec + RCP + Sovann Kim

Rolling stock

Alstom

Street Furniture Designers

SERI

Photographer

Cécile Septet + Baptiste Jayat

Press